المديرية العامة لانتاج الطاقة الكهربائية / الوسطى
Middle general directorate
 TIME  DATE  MW  Station Names
 08:03  2017-04-30

 53

 Baghdad-South1(St)
 13:38  2017-04-30

 286

 Daura(St)
 08:04  2017-04-30

 1889

 Wasit-Alzabedea(St)
 08:15  2017-04-30

 0

 AL-sader(G)
 08:07  2017-04-30

 0

 Baghdad-South(G)
 07:45  2017-04-30

 87

 Baghdad-South 2(G)
 08:04  2017-04-30

 0

 Daura(G)Rasheed
 08:08  2017-04-30

 

 Guds(G)
 08:06  2017-04-30

 93

 Taji-N.(G)
 08:05  2017-04-30

 90

 Taji-Old(G)
 08:11  2017-04-30

 0

 Ali Sabi(D)
 08:12  2017-04-30

 0

 Hundai(D)
 08:12  2017-04-30

 0

 Makhlis Kafi(D)
 08:13  2017-04-30

 10

 Samarra (D)
 08:10  2017-04-30

 90

 Haditha(Hy)
 08:08  2017-04-30

 17

 Himrin(Hy)
 08:09  2017-04-30

 60

 Samarra(Hy)
 2675